ConstructIQ

Phase 05 / AI Estimation

Powered by computer vision + rate database AI

Upload drawings. Get a BOQ in minutes.

AI reads your architectural and structural drawings, extracts quantities, applies current CPWD/PWD/DSR rates, and generates NIT-ready tender documents — no quantity surveyor required.

<15 min

BOQ generation from uploaded drawings

3–5%

Quantity accuracy vs. manual QS takeoff

1000+

Rate line items from CPWD/PWD/DSR databases

What's included

No QS. No guesswork. Just accurate BOQs.

Quantity surveyors take weeks and cost thousands per project. ConstructIQ's AI estimation engine delivers the same output in minutes — directly linked to government-standard rate databases.

Before ConstructIQ

With ConstructIQ

Hire a Quantity Surveyor — 7–15 days, ₹20,000–₹80,000 fee per project

Upload drawings, get a BOQ in under 15 minutes — no QS fee

Contractor quote has no basis — you can't tell if ₹45L is fair or padded

AI BOQ audit compares contractor line-by-line — padding is visible immediately

Government tender requires NIT format — requires specialist document preparation

NIT-ready tender documents generated alongside BOQ in one workflow

Drawing Upload & Parsing

Upload architectural and structural drawings in PDF or DWG format. The AI engine reads floor plans, sections, and elevations — extracting room dimensions, wall lengths, slab areas, and structural members automatically.

Quantity Extraction

Floor-wise quantity takeoff for earthwork, concrete, masonry, plastering, flooring, paint, waterproofing, and MEP rough-ins. Accuracy within 3–5% of a senior quantity surveyor's manual takeoff.

Rate Database (CPWD/PWD/DSR)

Integrated with current Central PWD, state PWD, and District Schedule of Rates databases. Rates auto-applied by district and financial year. Updated quarterly from official gazette notifications.

BOQ Generation

Full Bill of Quantities output: item description, unit, quantity, rate, and amount — broken by trade and sub-trade. Export to Excel, PDF, or push directly into the Construction Packages module.

Tender Document Output

NIT-ready Notice Inviting Tender documents generated alongside the BOQ — conditions of contract, scope of work, technical specifications, and schedule of quantities in the PWD standard format.

Contractor Quote Audit

Upload a contractor's quote and the platform audits it line by line against your AI-generated BOQ. Over-billing flagged in red, under-specified items highlighted in amber. Negotiate with data.

How it works

Drawings in. Tender-ready BOQ out.

01

Upload PDF/DWG drawings

Upload your architectural drawings — ground floor plan, upper floor plan, and structural layout. The AI parser identifies walls, openings, columns, beams, slabs, staircases, and roof elements from the drawing geometry.

02

AI extracts quantities and applies rates

The engine runs a complete quantity takeoff trade by trade — excavation, PCC, RCC, brickwork, plaster, tiles, painting, and electrification. Current CPWD/PWD rates for your district and financial year are applied automatically.

03

Download BOQ and NIT documents

Review the BOQ in the platform editor. Edit quantities or rates if needed. Download the final BOQ in Excel or PDF. Generate NIT-ready tender documents for government procurement or competitive contractor bidding in one click.

BUILD SMARTER. BUILD ONCE.

Ready to bring your project on-platform?

Join the Bihar pilot. Free during beta. Onboarding takes under an hour.