ConstructIQ

Phase 02 / Material Supply

Materials from manufacturer. Not middlemen.

Eliminate the 5-layer distribution chain. Cement, steel, aggregates, bricks, and fittings ordered against your BOQ, tracked to your gate.

40%

Avg. markup eliminated vs. local dealers

48 hr

Replacement SLA on failed quality check

5

Distribution layers bypassed

What's included

Every material. Every stage. Zero guesswork.

Cement, steel, sand, aggregates, bricks, AAC blocks, fittings — all procurement through one interface, against one BOQ, with quality checks at every touchpoint.

Before ConstructIQ

With ConstructIQ

5-layer distribution chain adds 30–40% to material cost

Manufacturer-direct pricing — only logistics cost on top

Paper challans, manual count — easy to fake quantity or grade

QR-coded digital receipts matched against BOQ order at gate

No benchmark — you have no idea if the rate is fair

Live district-level price index from AI Estimation rate database

Manufacturer Direct

Skip distributors, sub-distributors, and local dealers. Cement from ACC/UltraTech, steel from SAIL affiliates, aggregates from licensed quarries — routed straight to your gate.

BOQ-Linked Ordering

Your Bill of Quantities drives the order. Quantities auto-populated. No manual re-entry, no under-ordering, no over-stocking. Change the BOQ and the order updates.

Quality Verification

Every batch comes with test certificates. Our field agents perform random slump tests for concrete and bend tests for steel. Substandard material triggers an instant replacement order.

Delivery Tracking

GPS-tracked trucks from loading dock to your gate. Real-time ETA updates. Digital Delivery Receipt generated at the gate — no paper challan fraud.

Price Benchmarking

AI Estimation module continuously indexes market rates for cement, steel, sand, and aggregates across districts. You always know if you're paying a fair rate.

Returns & Disputes

Damaged or substandard delivery? Raise a dispute with photo evidence. Our supplier SLA mandates replacement within 48 hours. Escrow holds payment until resolution.

How it works

From BOQ to gate delivery in three steps.

01

BOQ pulls material list automatically

Once your Construction Package or AI Estimation BOQ is finalized, Material Supply reads every line item. Cement quantity, steel grade, aggregate type — all pre-populated for your approval.

02

Compare manufacturer quotes

The platform requests quotes from 3–5 verified manufacturers per material category. Compare price, lead time, and quality rating side by side. No phone calls, no site visits.

03

Order, track, verify on delivery

Confirm your order with one tap. Track the truck on a map. At delivery, the gate agent scans the invoice QR code to match against your order — quantity, grade, and supplier all verified.

BUILD SMARTER. BUILD ONCE.

Ready to bring your project on-platform?

Join the Bihar pilot. Free during beta. Onboarding takes under an hour.