Case studies
Family home in Patna, Bihar — Saved ₹4.2 lakh on a ₹28L project with BOQ verification
The Sinha family in Patna were quoted ₹32L for a G+1 house by their contractor — far above what ConstructIQ's AI BOQ estimated for the same specification. After sharing the platform's BOQ with the contractor and switching to milestone-linked payments, the final cost came to ₹27.8L, including all finishing. The verified BOQ also helped them secure a ₹18L construction loan from a partner NBFC in under a week.
School construction in Lucknow, UP — Loan disbursed in 11 days with BOQ-linked application
A private school operator in Lucknow was expanding their campus with a ₹1.2 crore construction project. Three banks had already declined their loan application citing inadequate project documentation. ConstructIQ generated a complete, CPWD-benchmarked BOQ from their approved drawings in under 4 hours. The resubmitted application with the verified BOQ was pre-qualified by a partner NBFC within 24 hours, with full disbursement in 11 days — enabling construction to start before the monsoon break.
Contractor in Ranchi, Jharkhand — Won 3 more bids after switching to AI BOQ
Rajesh Kumar, a civil contractor managing projects in Ranchi, had been losing bids to competitors with lower — often unrealistic — quotes. After onboarding onto ConstructIQ, he started submitting AI-generated BOQs with itemised CPWD rates instead of lump-sum quotations. His bids were now higher in some line items but substantially lower in others, and the detailed breakdown built trust with clients. He won three new projects in his first quarter on the platform, totalling ₹78L in contract value.
More coming soon.
We are documenting the beta cohort — 200+ projects across Bihar, UP, Jharkhand, and MP. Detailed case studies with full cost breakdowns, loan timelines, and contractor performance data will be published through 2026.
₹4.2L
Average savings per project on our beta cohort
11 days
Average time to construction loan disbursement
23%
Average reduction in material cost through direct procurement