Real projects. Real results.

Stories from homeowners, contractors, and institutions in Bihar, UP, and Jharkhand who used ConstructIQ to save money, access credit, and build better.

Case studies

Homeowner

Family home in Patna, Bihar — Saved ₹4.2 lakh on a ₹28L project with BOQ verification

₹4.2Lsaved on ₹28L project

The Sinha family in Patna were quoted ₹32L for a G+1 house by their contractor — far above what ConstructIQ's AI BOQ estimated for the same specification. After sharing the platform's BOQ with the contractor and switching to milestone-linked payments, the final cost came to ₹27.8L, including all finishing. The verified BOQ also helped them secure a ₹18L construction loan from a partner NBFC in under a week.

Institutional

School construction in Lucknow, UP — Loan disbursed in 11 days with BOQ-linked application

11 daysfrom application to disbursement

A private school operator in Lucknow was expanding their campus with a ₹1.2 crore construction project. Three banks had already declined their loan application citing inadequate project documentation. ConstructIQ generated a complete, CPWD-benchmarked BOQ from their approved drawings in under 4 hours. The resubmitted application with the verified BOQ was pre-qualified by a partner NBFC within 24 hours, with full disbursement in 11 days — enabling construction to start before the monsoon break.

Contractor

Contractor in Ranchi, Jharkhand — Won 3 more bids after switching to AI BOQ

3 bidswon in the first quarter

Rajesh Kumar, a civil contractor managing projects in Ranchi, had been losing bids to competitors with lower — often unrealistic — quotes. After onboarding onto ConstructIQ, he started submitting AI-generated BOQs with itemised CPWD rates instead of lump-sum quotations. His bids were now higher in some line items but substantially lower in others, and the detailed breakdown built trust with clients. He won three new projects in his first quarter on the platform, totalling ₹78L in contract value.

More coming soon.

We are documenting the beta cohort — 200+ projects across Bihar, UP, Jharkhand, and MP. Detailed case studies with full cost breakdowns, loan timelines, and contractor performance data will be published through 2026.

₹4.2L

Average savings per project on our beta cohort

11 days

Average time to construction loan disbursement

23%

Average reduction in material cost through direct procurement